EWIND Helps to Improve the Management Level of Beijing Daxing International Airport
2022-1-10 12:51:42Shenzhen, August 27, 2019 – Beijing Daxing International Airport Express, Daxing Airport Express for short, will open next 15th with Beijing Daxing International Airport. It is the first time to use bullet train as metro, and it is the fastest public transit line in Beijing. 3onedata EN50155 layer3 rack-mounted switch and gigabit managed embedded module have been used in the PIS system in Daxing Airport Express, helping to present train operation information and public media information to passengers in real time, and improve the service quality and management level of the Beijing Daxing International Airport.

PIS System Communication Requirements
a. Switch to redundant link immediately in the event of failure
b. Meet the requirement of MTBF
c. Industrial grade devices featuring with anti-interference, low malfunction and E-Maintenance
Ewind PIS Solution Advantages
a. The backbone network adopts digital transmission technology to solve the interference issue
b. The port trunking technology increases network stability and security
c. Industrial grade devices meet the requirement of MTBF
d. Flexible networking modes makes system can be extend according to needs

As yet, EWIND has serviced more than 100 metro lines, and has accumulated abundant experiences in rail transit field. Facing the future, we will take technical innovation as drive and develop more excellent products and solutions for customers.